Our Projects

Major Projects Completed

2011

  •  OSP and Cable Laying work for fiber upgration work at Mumbai at Various locations.

2010

  •  WImax Connectivity in Mumbai at Various locations
  •  Total Length: 30Km.

2009

  •  NLD Work from Chandrapur to Asifa
  •  WImax Connectivity in Mumbai at Various locations
  •  Total Length: 120Km.

2008

  •  WImax Connectivity in Mumbai at Various locations
  •  Total Length: 65Km.

2007

  •  Submarine Cable Connectivity - TCL, Bkc to Mahim
  •  Submarine Cable Connectivity - TCL, Churchgate to Nariman point
  •  Total Length: 08 Km.